last updated 19Oct22

Mouat Line

The location of the digitised original extant field notebooks is:
ACT / NSW border survey – Environment, Planning and Sustainable Development Directorate – Planning

Have a look at an album of Mouat Line Border Markers, Mile Markers and Blaze Trees.

If you’re accessing the photos via the thumbnails below, after doing so, give the photo a second click to see the border marker name in the Info item.

Download a gpx file of the Mouat Line Border Markers, Mile Markers and Blaze Trees. 701 points.

Border Markers from Mt Coree to Piccadilly Circus

Border markers in this area are covered in the digitised original field book A 1008 – Coree to P51 – FC18 sheet 13 – (PDF 13.6 mb):

Border Marker No Comment from Survey Notes5 ACTPLA Location
UTM4 55H (MGA)
Visited – click on a date for a walk report Click on a thumbnail below
to see the full sized Picture
Coree Trig 664566.702-6091358.403 25 May 10
7 Jul 09*
A50a 8″ Post 664523.304-6091285.968 25 May 10
7 Jul 09*
A50 8″ Post 664364.367-6091102.740 7 Jul 09*
B50 664348.428-6091034.659 7 Jul 09*
C50 8″ Post 664305.308-6090976.035 7 Jul 09*
D50 8″ Post 664272.264-6090900.468 7 Jul 09*
E50 8″ Post 664114.168-6090562.552 possibly found
25 May 10
not found
7 Jul 09
F50 8″ Post 663965.555-6090335.347 not found
7 Jul 09
G50 8″ Post 663939.368-6090192.403 not found
7 Jul 09
H50 8″ Post 663878.325-6089998.344 7 Jul 09*
1 Mile Concrete block and bolt covered by cairn 663839.616-6089948.172
(calculated)
7 Jul 09*
I50 8″ Post 663713.600-6089784.778 7 Jul 09*
J50 8″ Post 663800.676-6089497.633 31 Jul 12
7 Jul 09*
K50 8″ Post 663816.514-6089355.421 7 Jul 09*
L50 8″ Post 663801.004-6089251.706 7 Jul 09*
M50 8″ Post 663757.179-6088962.519 not found
31 Jul 12
N50 8″ Post 663634.918-6088819.737 31 Jul 12*
O50 8″ Post 663459.775-6088644.486 31 Jul 12*
2 Mile Concrete block and bolt covered by cairn 692881.392-6110915.510
(calculated)
not found
31 Jul 12
P50 8″ Post 663378.865-6088453.103 31 Jul 12*
Q50 8″ Post 663156.833-6088162.016 31 Jul 12*
R50 8″ Post 663071.919-6087978.181 31 Jul 12*
S50 8″ Post 662994.960-6087872.623 31 Jul 12*
T50 8″ Post 663166.292-6087557.731 not found
31 Jul 12
2 Feb 10
in the black berries!
U50 8″ Post 663211.731-6087366.273 31 Jul 12
2 Feb 10*
V50 8″ Post 663264.760-6087119.626 2 Feb 10*
3 Mile Concrete Block and Bolt covered by cairn 663271.567-6087100.299
(calculated)
2 Feb 10*
[1″ Pipe in ground covered by cairn] 2 Feb 10*
W50 8″ Post 663285.481-6087060.806 2 Feb 10*
X50 8″ Post 663447.791-6086862.726 2 Feb 10*
Y50 8″ Post 663494.709-6086615.487 2 Feb 10*
Z50 8″ Post 663497.951-6086280.534 2 Feb 10*
A51 8″ Post 663482.231-6086180.461 2 Feb 10*
B51 8″ Post 663428.552-6086029.435 2 Feb 10*
C51 8″ Post 663335.940-6085902.862 2 Feb 10*
D51 8″ Post 663242.596-6085727.565 2 Feb 10*
4 Mile Concrete Block and Bolt covered by cairn 663346.457-6085700.778
(calculated)
2 Feb 10*
E51 12″ Post set off 50 links square from centre of formation 663500.857-6085660.977 2 Feb 10*
Border Markers from Piccadilly Circus to Bulls Head

Border markers in this area are covered in the digitised original field books A 1008 – Coree to P51 – FC18 sheet 13 – (PDF 13.6 mb) and A 1010 – P51 to B54 – FC18 sheet 13 – (PDF 13.3 mb):

Border Marker No Comment from Survey Notes5 ACTPLA Location
UTM4 55H (MGA)
Visited – click on a date for a walk report Click on a thumbnail below
to see the full sized Picture
F51 8″ Post 663610.435-6085513.716 2 Feb 10*
G51 8″ Post 663602.835-6085358.107 2 Feb 10*
H51 8″ Post on Rocky Knob 663669.339-6085254.231 2 Feb 10*
I51 8″ Post 663831.445-6085186.702 2 Feb 10*
Pipe 1″ diam 15″ long and cairn 2 Feb 10*
J51 8″ Post 663976.099-6085017.762 2 Feb 10*
K51 8″ Post 664046.555-6084964.888 2 Feb 10*
L51 8″ Post 664047.455-6084859.523 2 Feb 10*
M51 8″ Post 663979.756-6084708.740 2 Feb 10*
N51 8″ Post 663925.108-6084612.085 2 Feb 10*
O51 8″ Post 663905.024-6084498.624 2 Feb 10*
5 Mile Concrete Block and Bolt Covered by Cairn 663905.125-6084494.984
(calculated)
2 Feb 10*
P51 8″ Post 663907.959-6084393.420 2 Feb 10*
Q51 8″ Post 663871.241-6084174.392 2 Feb 10*
R51 8″ Post 663866.011-6083982.054 2 Feb 10*
S51 8″ Post 663887.009-6083850.664 2 Feb 10*
T51 8″ Post 663875.933-6083742.101 2 Feb 10*
U51 8″ Post 663919.937-6083576.862 2 Feb 10*
V51 8″ Post 663982.474-6083439.434 2 Feb 10*
W51 8″ Post 664129.357-6083394.366 2 Feb 10*
X51 8″ Post 664213.408-6083322.908 2 Feb 10*
Y51 8″ Post 664281.848-6083239.661 13 Sep 16
2 Feb 10
*
Z51 8″ Post 664287.519-6083136.354 2 Feb 10*
6 Mile Bolt in concrete block covered by cairn 664283.713-6083083.102
(calculated)
4 Jan 11*
A52 8″ Post 664280.719-6083041.141 2 Feb 10*
B52 8″ Post 664208.035-6082985.944 4 Jan 11
2 Feb 10*
C52 8″ Post 664041.293-6082867.789 4 Jan 11
2 Feb 10*
D52 8″ Post 663923.594-6082752.976 4 Jan 11
2 Feb 10*

There is a survey line of points A52a, A52b, A52c and A52d to Bulls Head. We checked them out on 4 Jan 11, but found no markers at the locations.

Border Markers from Bulls Head to Aggie Gap

Border markers in this area are covered in the digitised original field books A 1010 – P51 to B54 – FC18 sheet 13 – (PDF 13.3 mb) and A 1011 – B54 to H55 – FC18 sheet 13 – (PDF 13.2 mb):

Border Marker No Comment from Survey Notes5 ACTPLA Location
UTM4 55H (MGA)
Visited – click on a date for a walk report Click on a thumbnail below
to see the full sized Picture
E52 8″ Post 663917.679-6082542.780 29 Sep 09*
F52 8″ Post 663809.146-6082343.436 29 Sep 09*
19 Jan 05
G52 8″ Post 663670.949-6082287.379 13 Sep 16
4 Jan 11

29 Sep 09*
H52 8″ Post 663583.590-6082247.550 29 Sep 09*
I52 8″ Post 663424.768-6082192.789 29 Sep 09*
J52 8″ Post 663177.690-6082033.474 29 Sep 09*
7 Mile Concrete Pipe 3″ and Cairn 663156.370-6082002.383
(calculated)
29 Sep 09*
K52 8″ Post 663081.073-6081892.557 29 Sep 09*
L52 8″ Post 663093.416-6081735.359 29 Sep 09*
M52 8″ Post 663085.815-6081509.007 29 Sep 09*
N52 8″ Post 663104.770-6081281.442 29 Sep 09*
O52 8″ Post 663066.947-6081100.671 29 Sep 09*
P52 8″ Post 663103.927-6080952.546 29 Sep 09*
Q52 8″ Post 663074.524-6080843.046 29 Sep 09*
R52 8″ Post 663120.002-6080688.108 29 Sep 09*
S52 8″ Post 663093.447-6080566.616 29 Sep 09*
8 Mile Concrete Pipe 3″ and Bolt covered by Cairn 663096.786-6080515.501
(calculated)
29 Sep 09*
T52 8″ Post 663100.907-6080452.558 29 Sep 09*
U52 8″ Post 663079.887-6080379.799 29 Mar 11
29 Sep 09*
V52 8″ Post 663018.462-6080329.684 29 Sep 09*
W52 8″ Post 662764.910-6080301.811 29 Sep 09*
X52 8″ Post 662553.768-6080247.401 29 Sep 09*
Y52 8″ Post 662381.253-6080216.658 29 Sep 09*
Z52 8″ Post 662306.957-6080180.489 29 Sep 09*
19 Jan 05
A53 8″ Post 662150.677-6080144.338 29 Sep 09*
B53 8″ Post 662145.600-6079947.905 29 Sep 09*
C53 8″ Post 662187.611-6079713.158 29 Sep 09*
9 Mile Concrete Pipe 3″ and Bolt covered by Cairn 662218.287-6079656.560
(calculated)
29 Sep 09*
D53 8″ Post 662268.798-6079563.405 29 Sep 09*
E53 8″ Post 662408.799-6079488.697 29 Sep 09*
F53 8″ Post 662533.377-6079389.624 29 Sep 09*
G53 8″ Post 662490.682-6079237.281 29 Sep 09*
H53 8″ Post 662416.851-6079130.332 29 Sep 09*
I53 8″ Post 662449.709-6078950.009 29 Sep 09*
J53 8″ Post 662408.970-6078791.286 29 Sep 09*
K53 8″ Post 662404.623-6078677.328 29 Sep 09*
L53 8″ Post 662287.008-6078556.571 29 Sep 09*
M53 8″ Post 662349.450-6078373.401 29 Sep 09*
10 Mile Concrete Pipe 3″ and Bolt covered by Cairn 662360.467-6078300.695
(calculated)
29 Mar 11*
N53 8″ Post 662368.516-6078247.638 29 Sep 09*
O53 8″ Post 662398.893-6078188.716 16 Jan 16
29 Sep 09
*
P53 8″ Post 662345.128-6078142.669 29 Sep 09*
Q53 8″ Post 662254.308-6078072.544 29 Sep 09*
R53 8″ Post 662148.136-6077914.014 29 Sep 09*
S53 8″ Post 662065.295-6077764.985 29 Sep 09*
T53 8″ Post 662040.455-6077632.042 29 Sep 09*
U53 8″ Post 661959.371-6077544.419 29 Sep 09*
V53 8″ Post 661899.677-6077506.236 29 Sep 09*
W53 8″ Post 661668.939-6077442.471 29 Sep 09*
X53 8″ Post 661597.362-6077235.791 29 Sep 09*
11 Mile Concrete Pipe and Bolt covered by cairn 661517.928-6077098.724
(calculated)
12 Apr 11
29 Sep 09*
11 Mile survey blaze Marked with 45, broad arrow, R, M, 11 661535.565-6077101.799
(calculated)
16 Jan 16
12 Apr 11

2 May10*
Y53 8″ Post 661448.378-6076978.699 29 Sep 09*
Z53 8″ Post 661354.407-6076704.470 29 Sep 09*
A54 8″ Post 661090.353-6076510.297 29 Sep 09*
B54 8″ Post 661041.591-6076257.955 29 Sep 09*
C54 8″ Post 661059.858-6076039.404 29 Sep 09*
D54 8″ Post 661030.454-6075941.751 12 Apr 11
29 Sep 09*
E54 8″ Post 660991.951-6075860.523 29 Sep 09*
12 Mile 3″ Concrete Pipe covered by cairn 660920.728-6075690.629
(calculated)
29 Sep 09*
F54 8″ Post 660909.277-6075663.302 29 Sep 09*
G54 8″ Post 660972.296-6075424.062 29 Sep 09*
H54 8″ Post 661048.091-6075290.058 29 Sep 09*
I54 8″ Post 661090.632-6075153.033 29 Sep 09*
J54 8″ Post 661168.238-6075060.604 29 Sep 09*
K54 8″ Post 661068.135-6074932.511 29 Sep 09*
L54 8″ Post 661043.963-6074751.464 29 Sep 09*
M54 8″ Post 660929.595-6074584.178 29 Sep 09*
N54 8″ Post 660884.993-6074467.814 29 Sep 09*
O54 8″ Post 660858.761-6074399.995 29 Sep 09*
P54 8″ Post 660871.151-6074233.354 29 Sep 09*
13 Mile Concreted 3″ Dowpipe covered by cairn 660870.293-6074232.432
(calculated)
29 Sep 09*
Q54 8″ Post 660760.729-6074114.844 29 Sep 09*
R54 8″ Post 660626.526-6074076.900 29 Sep 09*
S54 8″ Post 660515.852-6073960.294 29 Sep 09*
T54 8″ Post, Old peg found and renewed (Mt Aggie) 660345.485-6073898.496 29 Sep 09*
U54 8″ Post 660304.885-6073711.992 29 Sep 09*
V54 8″ Post 660310.845-6073515.883 29 Sep 09*
W54 8″ Post 660309.879-6073350.596 29 Sep 09*
X54 8″ Post 660306.397-6073266.571 29 Sep 09*
Y54 8″ Post 660423.361-6073123.069 29 Sep 09*
14 Mile Concrete Pipe & Cairn not seen
29 Sep 09
Z54 8″ Post 660526.011-6072915.241 not seen
16 Jan 10
29 Sep 09
Border Markers from Aggie Gap to Mt Ginini

Border markers from Aggie Gap to Mt Ginini are covered in the digitised original field books A 1011 – B54 to H55 – FC18 sheet 13 – (PDF 13.2 mb), A 1013 – H55 to R56 – FC18 sheet 12, 13 – (PDF 13.0 mb) and A 1022 – Q56 to P58 – FC18 sheet 12 – (PDF 12.7 mb):

Border Marker No Comment from Survey Notes5 ACTPLA Location
UTM4 55H (MGA)
Visited – click on a date for a walk report Click on a thumbnail below
to see the full sized Picture
A55 8″ Post 660634.744-6072771.248 16 Jan 10*
B55 8″ Post 660621.884-6072612.112 16 Jan 10*
C55 8″ Post 660600.632-6072445.802 16 Jan 10*
D55 8″ Post 660651.301-6072276.719 16 Jan 10*
E55 8″ Post 660746.134-6072120.433 16 Jan 10*
F55 8″ Post 660841.476-6071987.624 16 Jan 10*
G55 8″ Post 660897.717-6071857.197 16 Jan 10*
H55 1″ Pipe 15″ long filled with concrete 660970.854-6071720.335 16 Jan 10*
I55 8″ Post 660970.276-6071652.634 16 Jan 10*
15 Mar 06*
J55 8″ Post 660960.292-6071596.011 16 Jan 10*
K55 8″ Post 660911.526-6071564.370 16 Jan 10*
15 Mile 3″ Concrete Pipe and 3″ Stake 660901.439-6071560.338
(calculated)
16 Jan 10*
L55 8″ Post 660850.794-6071540.093 16 Jan 10*
M55 1″ Pipe covered by cairn 660729.450-6071464.885 16 Jan 10*
N55 1″ Pipe covered by cairn 660640.112-6071411.319 16 Jan 10*
O55 8″ Post 660545.283-6071405.759 16 Jan 10*
P55 8″ Post 660445.587-6071312.680 16 Jan 10*
Q55 8″ Post 660284.166-6071212.155 16 Jan 10*
R55 8″ Post 660116.583-6071083.965 16 Jan 16
16 Jan 10
*
S55 8″ Post 660054.536-6070976.555 16 Jan 10*
T55 8″ Post 659977.064-6070789.981 16 Jan 10*
U55 8″ Post 659890.186-6070577.339 16 Jan 16
16 Jan 10
*
16 Mile 3″ Concrete Pipe and Cairn 659901.912-070458.979
(calculated)
16 Jan 10*
V55 8″ Post 659902.130-6070456.783 16 Jan 10*
W55 8″ Post 659997.936-6070307.624 16 Jan 10*
X55 8″ Post 660029.757-6070115.887 16 Jan 10*
Y55 8″ Post 660011.505-6069919.980 16 Jan 10*
Z55 8″ Post 660017.420-6069726.098 16 Jan 10*
A56 1″ Pipe covered by cairn 660088.326-6069489.671 16 Jan 10*
B56 1″ Pipe covered by cairn 660242.251-6069349.768 16 Jan 10*
C56 8″ Post 660324.796-6069285.937 16 Jan 10*
D56 3″ Downpipe with Concrete Core and bolt surrounded by cairn 660366.421-6069150.872 16 Jan 10*
17 Mile Concrete Post and Bolt Covered by Cairn 660281.393-069035.164
(calculated)
16 Jan 10*
E56 3″ Concreted Downpipe and Bolt Covered by cairn 660155.328-6068863.616 16 Jan 10*
F56 8″ Post 660238.531-6068738.217 16 Jan 10*
G56 8″ Post 660258.765-6068581.793 16 Jan 10*
H56 8″ Post 660239.160-6068468.023 16 Jan 10*
I56 8″ Post 660223.617-6068370.249 16 Jan 10
18 Apr 09*
J56 8″ Post 660244.726-6068203.038 18 Apr 09*
K56 8″ Post 660248.633-6067996.535 18 Apr 09*
L56 8″ Post 660268.127-6067831.546 18 Apr 09*
M56 8″ Post 660311.626-6067675.390 18 Apr 09*
18 Mile Concrete Pipe 3″ and Bolt Covered by Cairn 177977.622-577013.912
(ACT grid2 from annotated 1:16000 map segment)
= 660283-6067507 (MGA)
660283.484-6067507.932
(calculated)
18 Apr 09*
N56 8″ Post 660276.770-6067467.983 18 Apr 09*
O56 8″ Post 660301.638-6067298.845 18 Apr 09*
P56 1″ Pipe covered by cairn 660447.303-6067109.406 18 Apr 09*
Q56 1″ Pipe covered by cairn 660565.979-6066935.094 18 Apr 09*
R56 8″ Post 660613.073-6066856.985 18 Apr 09*
S56 3″ Downpipe with Concrete Core Surrounded by Cairn
(Annotated GONE on 1:16000 map segment)
660651.912-6066805.781 18 Apr 09*
T56 8″ Post 660679.701-6066751.417 18 Apr 09*
Border Markers from Mt Ginini to Stockyard Gap

Border markers in this area are also covered in the digitised original field book A 1022 – Q56 to P58 – FC18 sheet 12 – (PDF 12.7 mb). There are a total of 14 border markers located on the southern spur of Mt Ginini, down the old cleared ski slope and into the bush, defining the border over the little knoll and down to Stockyard Gap. Again, with the accurate ACTPLA data (to one thousandth of a metre!), it was a relative breeze to find them all:

Border Marker No Comment from Survey Notes5 ACTPLA Location
UTM4 55H (MGA)
Visited – click on a date for a walk report Click on a thumbnail below
to see the full sized Picture
U56 8″ Post 660671.981 6066588.743 16 Jan 16
18 Apr 09
*
V56 8″ Post 660622.635 6066388.089 16 Jan 16
18 Apr 09
*
W56 8″ Post 660577.006 6066243.206 16 Jan 16
18 Apr 09
*
X56 3″ Downpipe and Cairn 660488.908-6066066.701 30 Apr 11
5 Feb 11
18 Apr 09
21 Mar 09*
19 Mile 3″ Downpipe with Concrete Core Surrounded by cairn 178212.409-575576.831
(ACT grid2 from annotated 1:16000 map segment)
= 660488-6066066 (MGA)
660485.759-6066054.973
(calculated)
30 Apr 11
5 Feb 11
18 Apr 09*
Y56 3″ Downpipe Concrete Core and Cairn 660461.111-6065963.023 18 Apr 09
21 Mar 09*
Z56 3″ Downpipe with Concrete Core and Cairn 660440.924-6065836.043 18 Apr 09
21 Mar 09*
A57 8″ Post 660448.344-6065591.059 5 Feb 11
18 Apr 09
21 Mar 09*
B57 8″ Post 70 links W of knob, 6′ below absolute shed 660437.086-6065407.845 5 Feb 11
18 Apr 09*
C57 8″ Post 660419.407-6065339.071 5 Feb 11
18 Apr 09*
D57 8″ Post 660394.483-6065220.821 18 Apr 09*
E57 none 660417.182-6065143.347 18 Apr 09*
F57 none 660444.236-6065010.444 18 Apr 09*
G57 none 660568.178-6064812.325 18 Apr 09*
Border Markers on Little Ginini Mountain

This length of the border stretches from Stockyard Gap south up over Little Ginini Mountain then down to Pryors Hut. Border markers in this area are covered in the digitised original field book A 1022 – Q56 to P58 – FC18 sheet 12 – (PDF 12.7 mb). There are 10 border markers. As the pics show, all these have been visited. The only doubtful one is H57 and, having been there looking twice, I reckon it must have been bulldozed:

Border Marker No Comment from Survey Notes5 ACTPLA Location
UTM4 55H (MGA)
Visited – click on a date for a walk report Click on a thumbnail below
to see the full sized Picture
H57 none 660731.465-6064639.694
only a marker peg up on the side of the road found. Suspect BM has been bulldozed
18 Apr 09*
20 Mile Concrete Pipe and Cairn 178509.320-574093.041
(ACT grid2 from annotated 1:16000 map segment)
= 660755-6064577 (MGA)
660759.068-6064568.021
(calculated)
14 Apr 09*
I57 none 660805.655-6064447.142 14 Apr 09*
J57 none 660856.194-6064296.517 14 Apr 09*
K57 none 660903.202-6064161.837 14 Apr 09*
L57 1″ Pipe 660918.233-6064014.285 14 Apr 09*
M57 Pipe 660980.431-6063947.355 30 Apr 11
5 Feb 11
14 Apr 09*
M57 blaze 660991.657-6063947.031
(calculated)
30 Apr 11*
N57 none 661045.705-6063797.508 14 Apr 09*
O57 3″ Downpipe Concrete Core & Cairn – Station on knob Shist [sic] outcrop 661090.908-6063718.545 19 Oct 22
30 Apr 11
5 Feb 11
14 Apr 09*
P57 Downpipe and Cairn 661139.196-6063562.184 19 Oct 22
30 Apr 11
5 Feb 11
14 Apr 09*
Border Markers around Pryors Hut

Border markers in this area are covered in the digitised original field book A 1022 – Q56 to P58 – FC18 sheet 12 – (PDF 12.7 mb). Page 10b of the notebook (page 14 of the pdf file) shows the sketch of the area and page 11a (page 15 of the pdf) contains the survey data for Q57. Another marker, 191.78 links from Q57, unidentified except for the description ‘3″ Concrete Downpipe and Mound’, is the 21 Mile marker. I deduced this from the fact that the unidentified marker 60.31 links from X56 (see page 3b of the notebook) had a nearby blaze which included M19; the ACT Heritage Listing has entry 44 X56 and entry 45 19 Mile at the same location 604658; summing the distances between markers from 19 Mile to the marker near G57 gives 2 miles. These can both be found just S of Pryors Hut, on the W side of the Mt Franklin Road. This is where and how the border marker fetish started:

Border Marker No Comment from Survey Notes5 ACTPLA Location
UTM4 55H (MGA)
Visited – click on a date for a walk report Click on a thumbnail below
to see the full sized Picture
Q57 none 661181.304-6063005.333 30 Apr 11
5 Feb 11
12 Jun 10
19 May 09
14 Apr 09
21 Mar 09*
17 Mar 09
21 Mile 3″ Concrete Downpipe and Mound 178963.???-572568.???
(ACT grid2 from annotated 1:16000 map segment)
= 661180-6063043 (MGA)
661178.392-6063043.591
(calculated)
9-10 Jul 16
5 Feb 11
12 Jun 10
19 May 09
14 Apr 09
21 Mar 09*
17 Mar 09
Border Markers along the Mt Gingera ridge – will the real Mt Gingera please stand up

Border markers in this area are covered in the digitised original field book A 1022 – Q56 to P58 – FC18 sheet 12 – (PDF 12.7 mb).

Alex P provided me with copies of 1:16000 map segments from Mt Coree to Mt Gingera, developed as a project guide for when the border was re-marked in this area. It shows the Mt Gingera (Mouat) trig point in the centre of the ridge around the top, with border marker W57 at the same location. At the SE end of the ridge, the map is annotated with a hand drawn trig marker and ‘NATMAP’, with border marker X57 at the same location. With 106m difference between these two locations, it must be easy to sort this out – and it was. My Mt Gingera trips, right from the first time I was taken there, was to the guyed pole. This has X57 at its base and is, perhaps, the NATMAP Mt Gingera. Obvious once pointed out that the granite tors 106m to the NW along the ridge are higher. Will continue to hunt for W57 (the real Mt Gingera), although if the 1″ Gaspipe is driven flush into the cleft of the boulder, it will be hard to find if covered with leaf litter, etc:

Border Marker No Comment from Survey Notes5 ACTPLA Location
UTM4 55H (MGA)
Visited – click on a date for a walk report Click on a thumbnail below
to see the full sized Picture
R57 1″ Pipe 660666.630-6062541.193 30 Apr 11
5 Feb 11
14 Apr 09
21 Mar 09*
S57 none 660682.707-6062494.256 14 Apr 09*
T57 none 660725.623-6062377.865 14 Apr 09*
U57 Station on Granite Boulder 1″ Pipe cemented in crevisse [sic] of boulder about 12′ above ground 660864.749-6062197.522 14 Apr 09*
V57 1″ Pipe Rock Station 661030.003-6061901.631 14 Apr 09*
22 Mile 3″ Downpipe with Concrete Core and Bolt 178917.156-571311.027
(ACT grid2 from annotated 1:16000 map segment)
= 661106-6061788 (MGA)
661106.415-6061788.112
(calculated)
30 Apr 11
14 Apr 09*
W57 Mount Gingera (MOUAT) Trig Point – 1″ Gaspipe driven into cleft of Boulder
Mike L told me in 4/11 that Phil A put a drill hole and wing there during a 2004 re-survey
661255.85-6061566.164 not found
30 Apr 11
5 Feb 11
12 Jun 10
19 May 09,
14 Apr 09
Does anyone have a metal detector?
X57 1″ Pipe and Cairn 661318.641-6061480.184 30 Apr 11
12 Jun 10
19 May 09
14 Apr 09*
Border Markers from Mt Gingera to Blackfellows Gap

Border markers in this area are covered in the digitised original field books A 1022 – Q56 to P58 – FC18 sheet 12 – (PDF 12.7 mb) and A 1024 – P58 to R59 – FC18 sheet 12 – (PDF 11.5 MB). Another lovely area of mountain grasses and Snow Gums, very different to the harsh Mt Franklin fire trail down below to the E:

Border Marker No Comment from Survey Notes5 ACTPLA Location
UTM4 55H (MGA)
Visited – click on a date for a walk report Click on a thumbnail below
to see the full sized Picture
Y57 Iron Spike in rock 661342.951-6061414.897 19 May 09*
Z57 Pipe 1″x15″ on Boulder 661422.992-6061330.367 19 May 09*
A58 Pipe and Cairn 661478.169-6061257.226 19 May 09*
B58 1″ Galv Pipe and Cairn 661480.698-6061139.657 19 May 09*
C58 8″ Post 661511.131-6061032.948 19 May 09*
D58 8″ Post 661634.541-6060989.605 19 May 09*
E58 8″ Post 661728.819-6060947.549 19 May 09*
F58 1″ Galv Pipe and Cairn 661832.006-6060891.671 19 May 09*
G58 1″ Galv Pipe and Cairn on Rock Mass
Line drops 30′ Vertical 10 links on from Station
661872.553-6060762.430 19 May 09*
H58 1″ Galv Pipe and Cairn 661913.269-6060659.347 19 May 09*
I58 1″ Galv Pipe and Cairn 661926.866-6060598.937 19 May 09*
23 Mile Concreted downpipe and Cairn
Milepoint falls on side of boulder
661976.257-6060485.997
(calculated)
19 May 09*
J58 1″ Galv Pipe and Cairn 661976.246-6060486.048 19 May 09*
K58 1″ Galv Pipe and Cairn 662013.093-6060452.140 19 May 09*
L58 1″ Galv Pipe and Cairn 662035.371-6060347.289 19 May 09*
M58 1″ Pipe and Cairn 662048.481-6060294.913 19 May 09*
N58 1″ Galv Pipe and Cairn 662060.223-6060236.641 19 May 09*
O58 1″ Galv Pipe and Cairn 662016.534-6060149.776 11 May 10*
P58 1″ Galv Pipe and Cairn 661939.587-6059986.170 11 May 10*
Q58 8″ Post 661770.014-6059826.325 11 May 10*
R58 8″ Post 661613.456-6059680.198 27 Oct 12
11 May 10*
R58 survey tree 131°33′ 9.55 to Gum 661614.867-6059678.895
(calculated)
27 Oct 12
11 May 10*
Border Markers between Blackfellows Gap and Rolling Ground Gap

Border markers in this area are covered in the digitised original field book A 1024 – P58 to R59 – FC18 sheet 12 – (PDF 11.5 MB):

Border Marker No Comment from Survey Notes5 ACTPLA Location
UTM4 55H (MGA)
Visited – click on a date for a walk report Click on a thumbnail below
to see the full sized Picture
S58 1″ Pipe and Cairn 661540.257-6059461.959 not there
11 May 10
located in middle of road
T58 1″ Pipe and Cairn 661272.915-6059394.244 not there
11 May 10
24 Mile Concreted Downpipe sunk flush and Cairn 661223.247-6059377.252
(calculated)
visited location
but not identified
27 Oct 12
not searched for
11 May 10
U58 1″ Pipe and Cairn 661097.881-6059334.363 11 May 10*
V58 1″ Pipe and Cairn 660941.215-6059258.178 11 May 10*
W58 1″ Pipe and Cairn 660847.340-6059234.365 11 May 10*
X58 1″ Pipe and Cairn 660749.256-6059188.538 11 May 10*
Y58 1″ Galv Pipe and Cairn 660666.269-6059127.315 11 May 10*
Z58 1″ Galv Pipe and Cairn 660636.376-6059025.515 11 May 10*
A59 1″ Galv Pipe and Cairn 660564.566-6058931.882 11 May 10*
B59 1″ Pipe and Cairn 660529.089-6058815.380 11 May 10*
C59 1″ Galv Pipe and Cairn 660419.049-6058743.742 27 Oct 12*
D59 1″ Galv Pipe and Cairn 660293.191-6058682.853 11 May 10*
E59 1″ Pipe and Cairn 660243.930-6058670.290 11 May 10*
F59 1″ Pipe and Cairn Station on Boulder 660187.468-6058609.850 27 Oct 12
11 May 10*
G59 1″ Pipe and Cairn 660227.391-6058503.042 visited location
but not identified
27 Oct 12
25 Mile Concreted Downpipe and Cairn 660295.885-6058393.424
(calculated)
27 Oct 12*
H59 1″ Pipe and Cairn 660304.441-6058379.733 visited location
but not identified
27 Oct 12
I59 1″ Galv Iron Pipe and Cairn 660379.400-6058270.286 27 Oct 12*
J59 1″ Galv Pipe and Cairn 660413.539-6058179.055 27 Oct 12*
J59 blaze 660418.310-6058183.798
(calculated)
27 Oct 12*
remnant blaze
K59 8″ Post 660466.883-6058067.148 27 Oct 12*
L59 8″ Post 660558.595-6057922.276 visited location
but not identified
27 Oct 12
M59 8″ Post 660652.826-6057851.916 27 Oct 12*
N59 8″ Post 660755.290-6057777.702 27 Oct 12*
O59 8″ Post 660880.099-6057669.807 27 Oct 12*
Border Markers between Rolling Ground Gap and Leura Gap

Border markers in this area are covered in the digitised original field book A 1024 – P58 to R59 – FC18 sheet 12 – (PDF 11.5 MB) and A 1055 – K59 to K76 – FC18 sheet 11, 12 – (PDF 12.5 mb). There are 19 border markers in the area – P59, Q59 and R59 with no descriptions; 26 Mile with description ‘3″ Concreted Downpipe and Mound’; A73, B73, C73 with no descriptions; D73, E73, F73, G73, H73 sketched on page 5b of the notebook with description ‘All stations marked with iron pipes 1″x15″ filled with concrete, sunk flush and surrounded by cairn’; I73, J73, K73, L73 sketched on page 6b of the notebook with description ‘All stations marked by iron pipes 1″x15″ sunk flush, filled with concrete and cairned.’; M73, N73, O73 with no description. In the sketch on page 7b of the notebook, a marker with description ‘Concreted Downpipe and Cairn’ is crossed through – yet it must correspond to site # 65 in the ACT Heritage Register list for the 27 Mile marker. Found 1 by chance prior to border marker mania setting in and plan to go back on 19 May 09:

Border Marker No Comment from Survey Notes5 ACTPLA Location
UTM4 55H (MGA)
Visited – click on a date for a walk report Click on a thumbnail below
to see the full sized Picture
P59 8″ Post 661049.605-6057471.160 visited location
but not identified
27 Oct 12
Q59 8″ Post 661127.427-6057317.616 27 Oct 12*
R59 Pipe and Cairn Open swampy flat 661172.127-6057161.698 27 Oct 12*
26 Mile 3″ Concreted Downpipe 2′ long and Cairn 661189.352-6057101.616
(calculated)
27 Oct 12*
A73 661241.681-6057002.365 Possible
identification
27 Oct 12*
B73 661235.634-6056926.952 27 Oct 12*
C73 661257.433-6056700.777 27 Oct 12*
D73 661183.642-6056547.859 27 Oct 12*
E73 661150.270-6056449.871 27 Oct 12*
F73 661159.958-6056325.035 27 Oct 12*
G73 All stations marked with iron pipes 1″x15″ filled with concrete, sunk flush and surrounded by cairn 661230.897-6056184.596 27 Oct 12*
9-10 Jan 09
H73 All stations marked with iron pipes 1″x15″ filled with concrete, sunk flush and surrounded by cairn 661252.887-6056073.625 27 Oct 12*
I73 661403.072-6056047.899 27 Oct 12*
J73 661467.251-6055914.760 27 Oct 12*
K73 661496.412-6055789.492 27 Oct 12*
27 Mile 661467.860-6055697.040
(calculated)
27 Oct 12*
L73 661450.097-6055639.528 27 Oct 12*
M73 661395.476 -6055597.673 27 Oct 12*
N73 661334.563-6055535.352 27 Oct 12*
O73 5-6 Apr 13*

Border Markers from Leura Gap to Bimberi Gap

Border markers in this area are covered in the digitised original field book A 1055 – K59 to K76 – FC18 sheet 11, 12 – (PDF 12.5 mb).

Border Marker No Comment from Survey Notes5 ACTPLA Location
UTM4 55H (MGA)
Visited – click on a date for a walk report Click on a thumbnail below
to see the full sized Picture
P73 660827.217-6054920.131 5-6 Apr 13*
Q73 660776.133-6054908.103 5-6 Apr 13*
28 Mile Concreted Downpipe and Cairn, mile point falls on side of boulder 660364.999-6054558.523
(calculated)
5-6 Apr 13*
R73 660333.660-6054531.888 5-6 Apr 13*
S73 660365.999-6054461.708 visited location
but not identified
5-6 Apr 13
T73 660430.952-6054396.804 5-6 Apr 13*
U73 660406.019-6054270.520 5-6 Apr 13*
V73 660377.680-6054162.615 visited location
but not identified
5-6 Apr 13
W73 660404.464-6053995.103 5-6 Apr 13*
X73 660367.607-6053885.018 5-6 Apr 13*
Y73 660282.733-6053841.706 5-6 Apr 13*
Z73 660165.021-6053886.977 5-6 Apr 13*
A74 660071.182-6053775.067 5-6 Apr 13*
B74 660014.777-6053718.850 5-6 Apr 13*
C74 660055.713-6053655.987 5-6 Apr 13*
D74 660097.880-6053582.792 5-6 Apr 13*
E74 660197.476-6053480.119 5-6 Apr 13*
F74 660253.345-6053441.466 5-6 Apr 13*
29 Mile Concreted Downpipe and Cairn 660304.395-6053445.887
(calculated)
5-6 Apr 13*
G74 Station on granite boulder 660396.077-6053453.824 5-6 Apr 13*
H74 660492.018-6053417.995 5-6 Apr 13*
I74 660502.245-6053337.276 5-6 Apr 13*
J74 660510.078-6053204.012 5-6 Apr 13*
K74 660428.290-6053014.793 5-6 Apr 13*
L74 660454.944-6052951.145 5-6 Apr 13*
M74 660504.771-6052857.638 5-6 Apr 13*
N74 4″ Nail in Concrete in bare rock 660542.175-6052811.793 5-6 Apr 13*
O74 1″ Pipe and Cairn 660647.418-6052796.025 5-6 Apr 13*
O74 blaze 660645.036-6052795.128
(calculated)
5-6 Apr 13*
P74 1″ Pipe and Cairn 660706.410-6052773.868 visited location
but not identified
5-6 Apr 13
Q74 1″ Pipe and Cairn 660802.004-6052774.199 visited location
but not identified
5-6 Apr 13
R74 1″ Pipe and Cairn 660913.724-6052768.374 visited location
but not identified
5-6 Apr 13
S74 1″ Pipe and Cairn 660973.745-6052754.673 5-6 Apr 13*
T74 1″ Pipe and Cairn 661122.415-6052748.543 5-6 Apr 13*
U74 661216.418-6052746.558 5-6 Apr 13*
V74 661285.684-6052763.272 visited location
but not identified
5-6 Apr 13
30 Mile Concreted Downpipe and Cairn 661289.879-6052761.567
(calculated)
visited location
but not identified
5-6 Apr 13
W74 661370.529-6052728.777 5-6 Apr 13*
X74 661431.456-6052708.065 5-6 Apr 13*
Y74 661510.104-6052644.954 5-6 Apr 13*
Z74 661600.705-6052613.196 5-6 Apr 13*
A75 661677.897-6052581.382 5-6 Apr 13*
B75 661709.365-6052526.389 5-6 Apr 13*
C75 Spike and Cairn 661698.961-6052455.743 5-6 Apr 13*
D75 1″ Pipe and Cairn 661754.079-6052241.882 5-6 Apr 13*
E75 1″ Pipe and Cairn 661807.480-6052224.291 5-6 Apr 13*
F75 Spike and Cairn 662007.742-6052313.155 5-6 Apr 13*
Border Markers from Bimberi Peak through Murrays Gap to Mt Murray

Border markers in this area are covered in the digitised original field books A 1055 – K59 to K76 – FC18 sheet 11, 12 – (PDF 12.5 mb) and A 1056 – K76 to W79 – FC 18 sheet 11 – (PDF 12.6 mb):

Border Marker No Comment from Survey Notes5 ACTPLA Location
UTM4 55H (MGA)
Visited – click on a date for a walk report Click on a thumbnail below
to see the full sized Picture
Bimberi Trig Station 662078.213-6052360.256 12-14 Sep 06*
5-6 Apr 13
G75 1″ Pipe and Cairn 662178.150-6052272.278 23-24 May 15
5-6 Apr 13
*
H75 1″ Pipe and Cairn 662262.293-6052164.065 5-6 Apr 13*
I75 1″ Pipe and Cairn 662368.086-6052046.999 5-6 Apr 13*
31 Mile Concreted Downpipe sunk 4″ below surface 662384.058-6052017.742
(calculated)
5-6 Apr 13*
J75 1″ Pipe and Cairn 662411.609-6051967.260 5-6 Apr 13*
K75 1″ Pipe and Cairn 662457.194-6051889.648 5-6 Apr 13*
L75 1″ Pipe and Cairn 662599.422-6051804.848 5-6 Apr 13*
M75 1″ Pipe and Cairn 662590.391-6051739.197 5-6 Apr 13*
N75 1″ Pipe and Cairn 662626.052-6051689.766 5-6 Apr 13*
O75 1″ Pipe and Cairn 662682.479-6051615.677 5-6 Apr 13*
P75 1″ Pipe and Cairn 662778.038-6051540.111 5-6 Apr 13*
Q75 1″ Pipe and Cairn 662783.824-6051497.489 5-6 Apr 13*
R75 1″ Pipe and Cairn 662730.553-6051389.650 5-6 Apr 13*
S75 1″ Pipe and Cairn 662690.685-6051299.873 5-6 Apr 13*
T75 1″ Pipe and Cairn 662680.951-6051166.037 5-6 Apr 13*
U75 1″ Pipe and Cairn 662668.731-6051059.607 5-6 Apr 13*
V75 1″ Pipe and Cairn 662652.045-6050977.966 5-6 Apr 13*
W75 1″ Pipe and Cairn 662661.620-6050892.404 5-6 Apr 13*
X75 1″ Pipe and Cairn 662696.517-6050803.342 visited location
but not identified
5-6 Apr 13
Y75 1″ Pipe and Cairn 662723.147-6050705.757 5-6 Apr 13*
32 Mile Concreted Downpipe sunk flush and Cairn 662725.551-6050621.368
(calculated)
visited location
but not identified
5-6 Apr 13
Z75 1″ Pipe and Cairn 662727.172-6050564.273 5-6 Apr 13*
A76 1″ Pipe and Cairn 662753.229-6050480.672 5-6 Apr 13*
B76 1″ Pipe and Cairn 662738.174-6050374.633 5-6 Apr 13*
C76 1″ Pipe and Cairn 662728.949-6050317.474 5-6 Apr 13*
D76 1″ Pipe and Cairn 662711.325-6050232.929 5-6 Apr 13*
E76 662669.292-6050144.857 5-6 Apr 13*
F76 662680.988-6050091.949 5-6 Apr 13*
G76 662664.295-6050007.531 4 Feb 12
5-6 Apr 13*
H76 1″ Pipe 662629.628-6049894.720 not found
1-4 Oct 10
visited location
but not identified
5-6 Apr 13
I76 1″ Pipe 662575.437-6049761.622 not found
1-4 Oct 10
visited location
but not identified
5-6 Apr 13
J76 1″ Pipe Concreted 662493.221-6049658.673 possible find
1-4 Oct 10*
visited location
but not identified
5-6 Apr 13
K76 1″ Pipe and Cairn 662473.418-6049599.387 5-6 Apr 13*
L76 1″ Pipe and Cairn 662389.627-6049492.972 5-6 Apr 13*
M76 1″ Pipe and Cairn 662346.778-6049427.007 visited location
but not identified
5-6 Apr 13
N76 1″ Pipe and Cairn 662308.151-6049379.817 visited location
but not identified
5-6 Apr 13
O76 662266.439-6049308.733 5-6 Apr 13*
P76 662245.005-6049237.001 5-6 Apr 13*
Q76 662233.677-6049171.380 5-6 Apr 13*
33 Mile Short downpipe with concrete core buried 3″ 662227.412-6049152.463
(calculated)
5-6 Apr 13*
R76 662204.974-6049084.724 5-6 Apr 13*
S76 662181.845-6049028.815 5-6 Apr 13*
Border Markers from Mt Murray to Yaouk Gap

This is a grand Snow Gum and mountain grasses area. The border markers are covered in the digitised original field book A 1056 – K76 to W79 – FC 18 sheet 11 – (PDF 12.6 mb).

Border Marker No Comment from Survey Notes5 ACTPLA Location
UTM4 55H (MGA)
Visited – click on a date for a walk report Click on a thumbnail below
to see the full sized Picture
T76 Mt Murray Summit 662091.197-6048994.956 7 Apr 09*
5-6 Apr 13
U76 1″ Pipe and Cairn 662085.740-6048941.595 7 Apr 09*
5-6 Apr 13
V76 1″ Pipe and Cairn 662069.954-6048863.258 5-6 Apr 13*
V76 blaze 662069.435-6048859.025
(calculated)
5-6 Apr 13*
W76 1″ Pipe and Cairn 662085.152-6048813.843 5-6 Apr 13*
X76 1″ Pipe and Cairn 662100.587-6048762.359 5-6 Apr 13*
Y76 662067.296-6048710.923 5-6 Apr 13*
Z76 662064.718-6048651.655 5-6 Apr 13*
A77 662085.718-6048587.267 5-6 Apr 13*
B77 1″ Pipe and Cairn 661995.842-6048433.961 5-6 Apr 13*
C77 1″ Pipe and Cairn 661968.063-6048373.154 5-6 Apr 13*
D77 1″ Pipe and Cairn 661920.428-6048307.884 5-6 Apr 13*
E77 1″ Pipe and Cairn 661894.920-6048238.675 5-6 Apr 13*
F77 1″ Pipe and Cairn 661836.485-6048163.394 visited location
but not identified
5-6 Apr 13
G77 661809.250-6048094.508 5-6 Apr 13*
H77 661848.216-6047986.875 5-6 Apr 13*
I77 661880.982-6047893.512 5-6 Apr 13*
J77 1″ Pipe and Cairn 661912.880-6047819.677 5-6 Apr 13*
34 Mile Concreted Downpie and Cairn Mile Point comes on side of boulder 661951.875-6047740.013
(calculated)
5-6 Apr 13*
K77 1″ Pipe and Cairn 661954.604-6047734.425 5-6 Apr 13*
L77 1″ Pipe and Cairn 661970.987-6047662.704 5-6 Apr 13*
M77 661997.362-6047586.243 5-6 Apr 13*
N77 1″ Pipe and Cairn 662040.459-6047528.107 5-6 Apr 13*
O77 1″ Pipe and Cairn 662038.167-6047466.928 5-6 Apr 13*
P77 1″ Pipe and Cairn 662071.894-6047427.127 5-6 Apr 13*
Q77 1″ Pipe and Cairn 662127.380-6047385.991 7 Apr 09*
5-6 Apr 13
R77 1″ Pipe and Cairn 662189.673-6047334.974 visited location
but not identified
5-6 Apr 13
S77 1″ Pipe and Cairn 662235.328-6047273.788 5-6 Apr 13*
T77 1″ Pipe and Cairn 662224.241-6047206.747 5-6 Apr 13*
U77 1″ Pipe and Cairn Station in granite rock 662274.533-6047155.455 5-6 Apr 13*
V77 1″ Pipe and Cairn 662319.024-6047126.299 5-6 Apr 13*
W77 1″ Pipe and Cairn 662416.866-6047017.257 5-6 Apr 13*
X77 1″ Pipe and Cairn 662486.929-6046957.197 5-6 Apr 13*
Y77 1″ Pipe and Cairn 662518.855-6046860.522 5-6 Apr 13*
Z77 1″ Pipe and Cairn 662495.239-6046800.926 5-6 Apr 13*
A78 662555.872-6046765.931 5-6 Apr 13*
B78 662653.499-6046694.934 5-6 Apr 13*
C78 662737.185-6046672.446 5-6 Apr 13*
D78 662779.855-6046619.813 5-6 Apr 13*
E78 662839.842-6046563.206 5-6 Apr 13*
35 Mile Concreted Downpipe and Cairn cannot calculate GR as no links in notebook visited location
but not identified
5-6 Apr 13
F78 662909.157-6046529.705 5-6 Apr 13*
F78 blaze 662909.501-6046531.431
(calculated)
5-6 Apr 13*
G78 662988.334-6046487.101 5-6 Apr 13*
H78 663042.742-6046427.200 5-6 Apr 13*
I78 663107.620-6046349.134 5-6 Apr 13*
J78 663197.226-6046270.179 5-6 Apr 13*
K78 663299.204-6046269.072 5-6 Apr 13*
L78 663400.277-6046169.595 visited location
but not identified
5-6 Apr 13
M78 663480.668-6046094.678 visited location
but not identified
5-6 Apr 13
N78 663527.843-6046021.367 5-6 Apr 13*
N78 blaze 663529.488-6046017.663
(calculated)
5-6 Apr 13*
O78 663589.775-6045908.331 visited location
but not identified
5-6 Apr 13
P78 663753.322-6045813.264 visited location
but not identified
5-6 Apr 13
Q78 663854.636-6045789.027 5-6 Apr 13*
R78 663890.678-6045697.755 5-6 Apr 13*
S78 663966.022-6045619.760 5-6 Apr 13*
T78 664014.113-6045605.993 5-6 Apr 13*
36 Mile Concreted Downpipe 2′ long with earth mound 664047.340-6045605.378
(calculated)
5-6 Apr 13*
U78 664094.690-6045604.496 5-6 Apr 13*
V78 664259.916-6045644.460 visited location
but not identified
5-6 Apr 13
W78 664374.849-6045696.036 visited location
but not identified
5-6 Apr 13
X78 664508.554-6045724.609 visited location
but not identified
5-6 Apr 13
Y78 664681.944-6045632.939 visited location
but not identified
22 Mar 14
5-6 Apr 13
Border Markers in the Mt Scabby area

The Cotter River rises here and it would have to be one of the most beautiful areas in the Namadgi National Park. If the area is defined to be that above the 1700m contour, it contains 15 border markers and each one should be identifiable as there are no wooden posts. They are covered in the digitised original field book A 1057 – W79 to L82 – FC sheet 10, 11 – (PDF 12.4 mb). The border markers are – G80, H80 with descriptions ‘Concrete cylinder and cairn’; unidentified marker (Mile marker?) with description ‘Concreted cylinder covered with heavy cairn’; I80 with description ‘Concrete cylinder on bare granite and Cairn’; J80 ‘Concrete cylinder’; K80 ‘Concrete mark/cylinder and cairn’; L80, M80, N80, O80 and P80 with descriptions ‘Nail in concrete’; unidentified marker (41 Mile from ACT Heritage Register) with description ‘Concrete cylinder on bare granite heavily cairned’; Q80, R80 and S80 with descriptions ‘Concrete cylinder and cairn’. The following 5 found by good fortune prior to being given access to the ACTPLA data:

Border Marker No Comment from Survey Notes5 ACTPLA Location
UTM4 55H (MGA)
Visited – click on a date for a walk report Click on a thumbnail below
to see the full sized Picture
Z78 664842.751-6045468.365 22 Mar 14*
A79 664856.830-6045380.705 22 Mar 14*
B79 664894.488-6045286.708 22 Mar 14*
C79 664896.886 6045215.843 22 Mar 14*
D79 664933.814-6045106.860 visited location
but not identified
22 Mar 14
E79 665059.372-6045012.100 visited location
but not identified
22 Mar 14
F79 665140.314-6044985.295 22 Mar 14*
37 Mile Concreted Downpipe 2′ long sunk flush with rock cairn 665213.058-6044943.265
(calculated)
22 Mar 14*
G79 665317.620-6044882.835 22 Mar 14*
H79 665416.588-6044710.562 22 Mar 14*
I79 665434.560-6044634.043 22 Mar 14*
J79 665460.516-6044436.492 22 Mar 14*
K79 665512.653-6044212.742 22 Mar 14*
L79 665629.232-6044002.036 22 Mar 14*
M79 Spike cemented in cleft of granite rock 665754.880-6043894.098 22 Mar 14*
N79 Pipe 1″x15″ 665772.541-6043731.193 22 Mar 14*
38 Mile Concreted 2′ long Downpipe heavily cairned Milepoint on side of boulder 665854.562-6043531.630
(calculated)
22 Mar 14*
O79 Pipe 1″x15″ 665857.155-6043525.282 22 Mar 14*
P79 Pipe 1″x15″ 665908.105-6043277.520 22 Mar 14*
Q79 Pipe 1″x15″ 665959.747-6043209.431 22 Mar 14*
R79 Pipe 1″x15″ 666002.076-6043121.783 22 Mar 14*
S79 Pipe 1″x15″ 666124.326-6042982.945 22 Mar 14*
T79 Pipe 1″x15″ 666253.988-6042860.239 22 Mar 14*
U79 Cement cylinder on boulder 666350.330-6042715.505 22 Mar 14*
V79 Pipe 1″x15″ 666459.274-6042594.863 visited location
but not identified
22 Mar 14
W79 Pipe 1″x15″ and Cairn 666634.531-6042471.579 visited location
but not identified
22 Mar 14
X79 Pipe 1″x15″ and Cairn 666704.160-6042402.935 22 Mar 14*
Y79 1″ Pipe and Cairn 666792.753-6042311.731 22 Mar 14*
39 Mile 2″ Concreted Downpipe sunk flush with earth mound 666813.829-6042302.813 visited location
but not identified
22 Mar 14
Z79 1″ Pipe and Cairn 666913.709-6042260.540 22 Mar 14*
A80 Pipe 1″x15″ and Cairn 667004.905-6042148.166 22 Mar 14*
B80 Pipe 1″x15″ and Cairn 667120.169-6042101.029 22 Mar 14*
C80 Concrete mark on boulder 667166.233-6042083.986 22 Mar 14*
D80 Pipe 1″x15″ and Cairn 667230.285-6042098.339 22 Mar 14*
E80 Pipe 1″x15″ and Cairn 667358.828-6042055.772 22 Mar 14*
F80 8″ Spike and Cairn 667577.096-6042079.099 possible
identification
22 Mar 14*
G80 Concrete cylinder and cairn 667633.090-6042061.210 22 Mar 14*
H80 Concrete cylinder and cairn 667812.762-6041798.041 visited location
but not identified
22 Mar 14
40 Mile Concreted cylinder covered with heavy cairn 667743.575-6041420.195
(calculated)
22 Mar 14*
I80 Concrete cylinder on bare granite and Cairn 667696.772-6041164.843 22 Mar 14
13-14 Jul 13
15 Apr 08*
J80 Concrete cylinder; Cement mark on rock 667759.404-6040976.348 13-14 Jul 13*
K80 Concrete mark/cylinder and cairn; Cement mark on rock 667926.330-6040917.750 13-14 Jul 13*
L80 Nail in concrete; Cement mark on rock 667979.372-6040941.619 13-14 Jul 13*
M80 Nail in concrete; Cement mark on rock 668120.929-6041003.801 13-14 Jul 13
8-9 Jul 06*
N80 Nail in concrete; Cement mark on rock 668208.424-6041100.749 13-14 Jul 13
15 Apr 08*
O80 Nail in concrete; Cement mark on rock 668274.419-6041178.754 13-14 Jul 13
15 Apr 08*
P80 668379.275-6041345.621 13-14 Jul 13*
41 Mile 668280.345-6041661.506
(calculated)
13-14 Jul 13*
Q80 Concrete cylinder and Cairn 668263.170-6041716.475 13-14 Jul 13
15 Apr 08*
R80 668234.392-6041867.162 13-14 Jul 13*
S80 668302.393-6042161.776 13-14 Jul 13*
T80 668420.275-6042242.642 13-14 Jul 13*
U80 668534.197-6042400.390 13-14 Jul 13*
V80 668545.315-6042450.988 13-14 Jul 13*
W80 668550.890-6042518.726 13-14 Jul 13*
X80 668633.997-6042896.628 visited location
but not identified
13-14 Jul 13
Y80 668631.039-6043021.666 13-14 Jul 13*
42 Mile+1ch 668730.066-6043129.212
(calculated)
visited location
but not identified
13-14 Jul 13
Z80 Pipe 1″x15″ and cairn 668805.970-6043211.620 14-16 Mar 14
13-14 Jul 13*
A81 8″ Spike in Concrete 668871.528-6043426.576 14-16 Mar 14*
B81 Concrete cylinder and cairn 668811.995-6043600.966 14-16 Mar 14*
C81 Concrete cylinder and Cairn 668575.556-6043966.491 14-16 Mar 14*
D81 Concrete cylinder and Cairn 668739.765-6044215.430 14-16 Mar 14*
E81 Pipe 1″x15″ and Cairn 668866.820-6044180.143 14-16 Mar 14*
F81 Spike in concrete 668947.482-6044236.053 14-16 Mar 14*
G81 Concrete cylinder and Cairn 668992.898-6044271.950 14-16 Mar 14*
43 Mile 3″ Concreted Downpipe Sunk flush and heavily cairned 668995.951-6044315.609
(calculated)
14-16 Mar 14*
H81 Pipe 1″x15″ and Cairn 669001.750-6044398.446 14-16 Mar 14*
I81 Pipe 1″x15″ and Cairn 669073.204-6044488.047 14-16 Mar 14*
J81 Pipe 669166.516-6044647.475 14-16 Mar 14*
K81 Nail in concrete and cairn 669216.086-6044741.431 14-16 Mar 14*
L81 Pipe 1″x15″ and cairn 669274.577-6044874.643 14-16 Mar 14*
M81 Pipe 1″x15″ and Cairn 669315.992-6045019.306 14-16 Mar 14*
N81 Pipe 1″x15″ and cairn 669339.030-6045134.912 visited location
but not identified
14-16 Mar 14
O81 Pipe 669352.618-6045213.862 14-16 Mar 14*
P81 Nail in concrete and cairn 669363.935-6045332.479 14-16 Mar 14*
Q81 Nail in concrete and cairn 669510.359-6045466.881 14-16 Mar 14*
Border Markers between Mt Kelly and Sentry Box Mountain

The ones I have found are covered in the digitised original field books A 1057 – W79 to L82 – FC sheet 10, 11 – (PDF 12.4 mb) and A 1058 – L82 to R85 – FC18 sheet 10 – (PDF 12.4 mb). Data from the 1944 re-survey maps also covers this area:
12 May 12
>

Border Marker No Comment from Survey Notes5 ACTPLA Location
UTM4 55H (MGA)
Visited – click on a date for a walk report Click on a thumbnail below
to see the full sized Picture
R81 Concrete cylinder heavily cairned Named by me “Mt Kelly” 669850.608-6046040.743 14-16 Mar 14
13-14 Jul 13
7-8 Jul 12
19 Sep 09*
15 Dec 07
21-22 Jul 07
9-11 Dec 06
8-9 Jul 06
22-24 Apr 06
2-3 Jan 06
S81 Cement mark 669893.625-6045991.961 14-16 Mar 14*
7-8 Jul 12
19 Sep 09*

T81 Pipe 1″ x 15″ and cairn 670041.423-6045951.185 14-16 Mar 14*
7-8 Jul 12
V81 Pipe 1″ x 15″ and cairn 670395.181-6045778.350 14-16 Mar 14
7-8 Jul 12*
W81 Pipe 1″ x 15″ and cairn 670504.607-6045698.309 14-16 Mar 14*
X81 Concrete cylinder and cairn
(but it’s a 1″ gal pipe)
670654.889-6045550.649 14-16 Mar 14*
Y81 Concrete cylinder and cairn 670703.053-6045398.608 14-16 Mar 14*
Z81 Concrete cylinder and cairn 670783.715-6045251.730 14-16 Mar 14*
A82 Concrete cylinder and cairn 670888.139-6045152.349 14-16 Mar 14*
B82 Concrete cylinder and cairn 670995.189-6044926.526 14-16 Mar 14*
C82 Pipe 1″ x 15″ and cairn 671141.869-6044522.289 14-16 Mar 14*
D82 Concrete cylinder and cairn 671152.636-6044295.058 14-16 Mar 14*
E82 Pipe 1″ x 15″ and cairn 670775.072-6043944.012 visited location
but not identified
30-31 May 15
14-16 Mar 14
46 Mile 1″ Concreted pipe and earth mound 670774.036-6043937.101
(calculated)
visited location
but not identified
30-31 May 15
14-16 Mar 14
F82 Pipe 1″ x 15″ and cairn 670741.196-6043718.147 30-31 May 15*
G82 Pipe 1″ x 15″ and cairn 670740.605-6043571.564 30-31 May 15*
H82 Pipe 1″ x 15″ and cairn 670762.935-6043540.37 30-31 May 15*
I82 Concrete cylinder and cairn 670942.020-6043298.378 30-31 May 15*
J82 Pipe 1″ x 15″ and cairn 670989.656-6043165.165 visited location
possible identification
30-31 May 15*
K82 Spike driven in cleft of rock 671058.778-6042768.465 30-31 May 15*
L82 Spike in concrete 671166.874-6042560.100 30-31 May 15*
47 Mile 1″ Pipe and Cairn Mile point comes on face of cliff (calculated) 30-31 May 15*
M82 Spike in concrete in crevass of granite 671198.938-6042294.042 30-31 May 15*
N82 671254.925-6041976.922 30-31 May 15*
O82 Pipe 671347.553-6041959.045 30-31 May 15*
P82 Spike 671564.233-6042006.177 30-31 May 15*
Q82 Concrete cylinder 671682.123-6041972.558 5 Apr 08*
30-31 May 15*

R82 Concrete cylinder 671715.571-6041903.680 5 Apr 08*
30-31 May 15*

S82 Spike in concrete 671889.281-6041547.328 30-31 May 15*
T82 Cement cylinder 671906.934-6041536.995 not seen
28 Sep 10
U82 15″ Pipe 672003.621-6041435.035 30-31 May 15*
28 Sep 10
*

V82 15″ Pipe 672039.423-6041381.401 not seen
30-31 May 15
28 Sep 10
48 Mile 3″ Concreted Downpipe (bolt) and Cairn 672040.623-6041377.279
(calculated)
30-31 May 15*
W82 Cement cylinder 672066.249-6041289.256 30-31 May 15
28 Sep 10
*

X82 Concrete cylinder 672074.552-6041228.840 30-31 May 15
28 Sep 10
*

Y82 15″ Pipe and Cairn 672049.772-6041159.210 30-31 May 15
28 Sep 10
*
Z82 15″ Pipe and Cairn 672020.351-6041063.091 28 Sep 10*
A83 15″ Pipe and Cairn 671974.818-6040959.628 30-31 May 15
28 Sep 10
*
B83 Spike in cleft of rock 671929.563-6040809.004 30-31 May 15
28 Sep 10
*

C83 15″ Pipe and Cairn 671958.352-6040705.986 30-31 May 15
28 Sep 10
*

D83 671970.754-6040636.625 30-31 May 15
28 Sep 10
*
E83 Pipe and Cairn 671924.305-6040579.830 30-31 May 15
28 Sep 10
*

F83 Pipe and Cairn 671798.724-6040386.104 30-31 May 15
28 Sep 10
*
G83 Pipe and Cairn 671766.092-6040283.774 28 Sep 10*
H83 Pipe and Cairn 671693.167-6040154.616 28 Sep 10*
I83 671606.405-6040097.584 30-31 May 15
28 Sep 10
*
I83 blaze (calculated) 30-31 May 15
28 Sep 10*
J83 671485.348-6040017.875 30-31 May 15
28 Sep 10

12-13 Jul 10*
49M 3″ Concreted Downpipe (bolt) and Cairn 671468.959-6039998.592
(calculated)
30-31 May 15
28 Sep 10
*
K83 Pipe 671391.482-6039907.453 30-31 May 15
28 Sep 10
*
12-13 Jul 10*

L83 Pipe 671303.087-6039817.601 28 Sep 10
12-13 Jul 10*
M83 Pipe 671280.004-6039697.203 28 Sep 10*
N83 Pipe 671272.175-6039542.713 28 Sep 10
12-13 Jul 10*
O83 671308.509-6039316.186 12-13 Jul 10*
P83 671286.154-6039126.048 12-13 Jul 10*
Q83 Pipe 671252.859-6039054.951 12-13 Jul 10*
R83
(ACTPLA label this Rb83)
671321.556-6038874.730 14 Sep 10
12-13 Jul 10*
Ra83 671259.413-6038737.819 14 Sep 10*
Rb83
(ACTPLA
label this R83)
671309.854-6038596.970 14 Sep 10*
50 Mile 3″ Concreted Downpipe (bolt) and Cairn 671292.219-6038504.911
(calculated)
14 Sep 10*
S83 Cement cylinder on boulder 671282.801-6038455.815 14 Sep 10*
T83 Pipe 671264.456-6038278.800 14 Sep 10*
U83 Spike 671292.382-6038183.046 14 Sep 10*
V83 Pipe 671300.127-6038050.727 14 Sep 10*
W83 Pipe 671361.430-6037857.570 14 Sep 10*
X83 Pipe 671375.618-6037714.291 14 Sep 10*
Y83 Pipe 671376.472-6037652.984 14 Sep 10*
Z83 Pipe 671391.715-6037503.302 14 Sep 10*
A84 Pipe 671426.165-6037337.545 14 Sep 10*
B84 Concrete Cylinder 671431.402-6037293.344 14 Sep 10*
C84 Pipe 671494.495-6037165.002 14 Sep 10*
D84 Cement Cylinder 671438.456-6037056.270 14 Sep 10*
D84 survey blaze – possible 14 Sep 10*
51 Mile 3″ Concreted Downpipe (bolt) 14 Sep 10*
E84 Pipe 671361.070-6036939.908 14 Sep 10*
E84 survey blaze 14 Sep 10*
F84 Pipe 671315.053-6036884.411 14 Sep 10*
G84 Concrete Cylinder 671254.455-6036807.287 14 Sep 10*
H84 Pipe 671194.422-6036741.079 14 Sep 10*
I84 Pipe 671066.654-6036656.029 not seen
14 Sep 10
J84 Pipe 671070.323-6036541.564 14 Sep 10*
K84 Concrete Cylinder –
station on boulder
671044.130-6036413.069 14 Sep 10*
L84 670954.668-6036299.218 not seen
14 Sep 10
M84 Concreted Pipe and Cairn 670841.252-6036187.038 30 Aug 11*
N84 Concreted Pipe 1″X15″ and Cairn 670793.280-6036083.457 30 Aug 11*
O84 Pipe 670750.422-6035907.450 30 Aug 11*
P84 Concrete cylinder – Station on boulder 670712.996-6035786.870 30 Aug 11*
Q84 Pipe 670687.205-6035741.607 30 Aug 11*
52 Mile 1″ Pipe and Cairn 670576.480-6035650.253
(calculated)
30 Aug 11*
R84 Pipe 670529.322-6035611.372 30 Aug 11*
R84 blaze C’wealth broad arrow CT 670529.909-6035619.034
(calculated)
30 Aug 11*
possible identification
S84 Pipe 670483.970-6035538.390 30 Aug 11*
T84 Pipe 670458.557-6035475.568 30 Aug 11*
U84 Pipe 670523.409-6035392.582 30 Aug 11*
V84 Pipe 670552.964-6035345.752 30 Aug 11*
W84 Pipe 670669.513-6035249.274 30 Aug 11*
W84 blaze C’wealth broad arrow CT 670673.949-6035246.615
(calculated)
30 Aug 11*
X84 Pipe 670850.780-6035047.715 30 Aug 11*
Y84 Pipe on face 670918.510-6034924.667 30 Aug 11*
Z84 5″ Nail in concrete buried 3″ 670939.818-6034792.641 12 May 12
30 Aug 11*
A85 Pipe 670971.927-6034739.238 12 May 12
30 Aug 11*
B85 Pipe 671080.220-6034667.362 30 Aug 11*
C85 Pipe in cleft of rocks 671190.111-6034622.751 12 May 12
30 Aug 11*
D85 671269.598-6034625.536 12 May 12
30 Aug 11*
E85 5″ Nail set in concrete in granite cleft 671338.529-6034588.379 30 Aug 11*
53 Mile Concrete cylinder and cairn 671350.023-6034521.329
(calculated)
30 Aug 11*
F85 Concrete cylinder 671398.492-6034238.371 30 Aug 11*
G85 Concrete cylinder 671426.298-6033991.346 12 May 12
26 Apr 11*
H85 5″ Nail set in Concrete 671417.050-6033832.296 26 Apr 11
28 Nov 06*
3 July 04
I85 Pipe 671606.149-6033698.729 26 Apr 11*
J85 Concrete Cylinder 671796.456-6033642.151 26 Apr 11*
K85 traverse (to see Gedgenby trig) in original survey – not on border
L85 Old peg replaced by spike in concrete 671953.478-6033667.517 26 Apr 11*
Border Markers on the Scabby Range SE of Sentry Box Mountain

This part of the Scabby Range is wonderful granite slabs at the top, eventually dropping to a lovely area of dry sclerophyll forest, unburnt in 2003. So there is a number of surviving survey marker blazes. Border markers are covered in the digitised original field book A 1058 – L82 to R85 – FC18 sheet 10 – (PDF 12.4 mb). and A 1059 – R85 to R87 – FC18 sheet 10 – (PDF 13.7 MB):

Border Marker No Comment from Survey Notes5 ACTPLA Location
UTM4 55H (MGA)
Visited – click on a date for a walk report Click on a thumbnail below
to see the full sized Picture
M85 Spike set in concrete 672186.087-6033449.815 26 Apr 11*
54 Mile Concrete cylinder and cairn 672188.442-6033444.117
(calculated)
26 Apr 11*
No N85 in original survey
O85 Concrete Cylinder 672258.297-6033275.051 26 Apr 11*
P85 Concrete cylinder Station on Granite Boulder 672210.700-6033000.009 26 Apr 11*
Q85 Concrete cylinder Station on bare granite 672072.188-6032875.400 26 Apr 11*
R85 Concrete Cylinder 671954.390-6032864.750 26 Apr 11*
S85 Pipe and cairn 671900.912-6032762.129 26 Apr 11*
T85 Old peg replaced by pipe and cairn 671892.308-6032650.032 26 Apr 11*
U85 Old peg replaced by pipe and cairn 671904.766-6032535.334 26 Apr 11*
V85 Old peg replaced by concrete cylinder 671936.354-6032424.073 26 Apr 11*
W85 Old peg adopted 671957.246-6032378.847 8 Sep 12*
X85 Old peg replaced by concrete cylinder 671997.282-6032285.937 8 Sep 12*
Y85 Old peg replaced by pipe and cairn 672012.142-6032233.328 8 Sep 12
15 Mar 11*
Z85 Old peg replaced by pipe and cairn 672078.271-6032160.019 8 Sep 12
15 Mar 11*
A86 Stn on Sthn. fall of steep grade to summit of hill 672063.466-6032125.173 15 Mar 11*
55 Mile 3″ Downpipe with concrete core Heavily cairned 672044.038-6032089.277
(calculated)
15 Mar 11*
B86 Old peg adopted 672031.715-6032066.523 15 Mar 11*
C86 Old peg adopted 671975.472-6031973.852 15 Mar 11*
D86 Old peg adopted 671952.556-6031844.260 visited location
but not identified
15 Mar 11
D86 blaze C’wealth broad arrow C.T. 671947.561-6031848.724
(calculated)
15 Mar 11*
E86 Old peg found and adopted 672026.817-6031747.633 15 Mar 11*
F86 Old peg replaced by pipe 672030.901-6031660.929 visited location
but not identified
15 Mar 11
G86 Old peg replaced by concrete cylinder 672135.607-6031569.446 15 Mar 11*
H86 Old peg adopted 672172.457-6031466.681 15 Mar 11*
I86 Old peg replaced by pipe 672168.475-6031424.540 visited location
but not identified
15 Mar 11
I86 blaze C’wealth broad arrow C.T. 672173.444-6031420.614
(calculated)
possible identification
15 Mar 11*
J86 Old peg replaced by pipe 672246.845-6031343.985 15 Mar 11*
J86 blaze C’wealth broad arrow C.T. 672242.352-6031339.807
(calculated)
possible identification
15 Mar 11*
K86 Old peg replaced by pipe 672294.893-6031243.893 15 Mar 11*
L86 Old peg at fence angle adopted 672298.450-6031189.123 26 Apr 11
15 Mar 11*

L86 blaze C’wealth broad arrow CT. 672299.819-6031186.174
(calculated)
26 Apr 11
15 Mar 11*
M86 Old peg adopted 672271.254-6031124.884 visited location
but not identified
15 Mar 11
N86 Old peg adopted 672296.354-6031019.582 visited location
but not identified
15 Mar 11
N86 blaze C’wealth broad arrow CT. 672297.521-6031016.734
(calculated)
15 Mar 11*
O86 Old peg replaced by pipe 672284.456-6030922.140 15 Mar 11*
P86 Old peg replaced by Spike in concrete 672359.003-6030816.666 15 Mar 11*
Q86 Old peg adopted (on fence line) 672388.186-6030728.006 15 Mar 11*
56 Mile 3″ Concreted Downpipe 2′ long 672421.976-6030665.741 15 Mar 11*
R86 Old peg replaced by concrete cylinder 672422.616-6030664.548 possible identification
15 Mar 11*
S86 Old peg adopted 672528.152-6030643.979 visited location
but not identified
15 Mar 11
S86 blaze C’wealth broad arrow C.T. 672534.115-6030646.447 15 Mar 11*
T86 Old peg replaced by pipe 672592.733-6030536.456 15 Mar 11*
U86 Old peg adopted 672622.529-6030493.813 visited location
but not identified
15 Mar 11
U86 blaze C’wealth broad arrow C.T. 672629.066-6030493.727
(calculated)
15 Mar 11*
V86 Old peg found 672647.978-6030469.735 visited location
but not identified
15 Mar 11
W86 old peg repl. by pipe 672734.348-6030388.017 15 Mar 11*
X86 Old peg replaced by pipe 672893.659-6030371.188 visited location
but not identified
15 Mar 11
Y86 Old peg repl. by spike in Concrete 673043.061-6030354.733 possible identification
15 Mar 11*
Z86 Old peg replaced by pipe 673163.539-6030293.687 15 Mar 11*
Border Markers on the Boboyan Divide

The Boboyan Divide is a lovely area of dry sclerophyll forest, unburnt in 2003. So there is a number of surviving survey marker blazes. Border markers are covered in the digitised original field book A 1059 – R85 to R87 – FC18 sheet 10 – (PDF 13.7 MB):

Border Marker No Comment from Survey Notes5 ACTPLA Location
UTM4 55H (MGA)
Visited – click on a date for a walk report Click on a thumbnail below
to see the full sized Picture
A87 Old peg replaced by pipe 673204.991-6030261.818 15 Mar 11
B87 survey blaze 20 Jul 10*
furfy, remove this!
B87 Old peg replaced by Concrete Cylinder on huge granite boulder 673370.714-6030183.096 20 Jul 10*
C87 survey blaze 673416.741-6030018.798
(calculated)
15 Mar 11
20 Jul 10*
C87 673405.427-6030013.337
location in the middle of a fire trail
not seen
15 Mar 11
20 Jul 10
and never will
D87 Old peg replaced by pipe 673312.163-6029902.478 not seen
20 Jul 10
E87 673342.144-6029794.938 not seen
20 Jul 10
57 Mile 3″ Downpipe 2′ long sunk flush and heavily cairned calculated as
673403-6029754
not seen
20 Jul 10
F87 survey blaze 230°26′, 33.84lks, [Fed broad arrow] CT 673426.840-6029731.784
(calculated)
20 Jul 10*
F87 Old peg replaced by pipe 673432.174-6029736.014 20 Jul 10*
G87 Pipe 673556.804-6029610.150 not seen
20 Jul 10
H87 survey blaze 46°22′, 38.21lks, [Fed broad arrow] CT 673685.937-6029551.362
(calculated)
20 Jul 10*
H87 Old Peg replaced by spike 673680.268-6029546.171 20 Jul 10*
I87 Old peg 673751.354-6029490.512 not seen
20 Jul 10
J87 Old peg 673805.277-6029452.307 not seen
20 Jul 10
K87 Concrete Cylinder on Massive Granite Boulders 673926.875-6029311.772 possibly seen
20 Jul 10*
L87 survey blaze 326°48′, 48.41lks, [Fed broad arrow] CT 673935.585-6029232.054
(calculated)
20 Jul 10*
L87 673940.750-6029223.798 20 Jul 10*
M87 survey blaze 190°19′, 11.42lks, [Fed broad arrow] CT 674027.256-6029109.087
(calculated)
20 Jul 10*
M87 674027.713-6029111.338 20 Jul 10*
N87 674067.8326029069.240 20 Jul 10*
O87 Pipe 674157.978-6029000.936 20 Jul 10*
P87 survey blaze 118°46′, 6.9lks, [Fed broad arrow] CT
too far – check out calculation
possibly seen
20 Jul 10*
P87 Pipe 674277.113-6028956.628 possibly seen
20 Jul 10*
Q87 Pipe 674353.767-6028843.144 not seen
20 Jul 10
R87 End of Traverse Spike set in concrete 674440.120-6028686.487 20 Jul 10*